XL-Floor Duplex Rostrevor XL-Floor Panels being delivered XL-Floor Panels placed for install XL-Floor being installed XL-Floor being installed Frame being fixed on XL-Floor Walls Roof and windows installed Completed building envelope 4 double storey houses being built in Nairne with XL-Floor and DekFloor XL-Floor being added to floor frame on piers XL-Floor with DekFloor being added to wet areas and decking Framing being installed on XL-Floor Completed build Mezzanine Floor mezzanine Floor